The 45 North closures are horrible
There has to be a better plan for these patchwork repairs on 45N. They have 3 miles of 3 lanes shutdown for a 400FOOT area of construction. I hit it at 3:30pm and it was stopped for about 2miles. Heading back in 45S 5 hours later, that STOPPED TRAFFIC was now at 5miles. Whoever is planning these repairs needs a get their head checked.