Taylor Gully

News

Public Comment Period on Taylor Gully-Woodridge Village Plan Open to December 28

Last night, Harris County Flood Control District (HCFCD) revealed its long-awaited recommendations to reduce flood risk along Taylor Gully. The recommendations involve channel improvements, another Woodridge Village stormwater detention basin, and a new bridge at Rustling Elms. HCFCD is seeking public comment on the plan through December 28, 2022. Outline of Recommended Alternative Excessive runoff […]

The post Public Comment Period on Taylor Gully-Woodridge Village Plan Open to December 28 appeared first on Reduce Flooding.

Read More
News

Public Comment Period on Taylor Gully-Woodridge Village Plan Open to December 28

Last night, Harris County Flood Control District (HCFCD) revealed its long-awaited recommendations to reduce flood risk along Taylor Gully. The recommendations involve channel improvements, another Woodridge Village stormwater detention basin, and a new bridge at Rustling Elms. HCFCD is seeking public comment on the plan through December 28, 2022. Outline of Recommended Alternative Excessive runoff […]

The post Public Comment Period on Taylor Gully-Woodridge Village Plan Open to December 28 appeared first on Reduce Flooding.

Read More
News

Last Reminder: Taylor Gully Meeting Wednesday 6:30 p.m.

Harris County Flood Control District will hold a virtual Taylor Gully meeting Wednesday, December 14, 2022 at 6:30 p.m. Purpose: to discuss the findings of its plan to reduce flood risk along Taylor Gully. Register at: PublicInput.com/taylor. To learn more about the project scope, see this post. It discusses the related effort to virtually double […]

The post Last Reminder: Taylor Gully Meeting Wednesday 6:30 p.m. appeared first on Reduce Flooding.

Read More
News

Save the Date: HCFCD Releases Details of Taylor Gully Meeting

On Dec. 2, I printed a story about an upcoming virtual community meeting on Taylor Gully. At the time, Harris County Flood Control District (HCFCD) had not yet released details yet on how to attend. They have now. See their press release below. Please share it with family, friends and neighbors if you live anywhere […]

The post Save the Date: HCFCD Releases Details of Taylor Gully Meeting appeared first on Reduce Flooding.

Read More
News

Taylor Gully-Woodridge Village Meeting Scheduled for Dec. 14

The Harris County Flood Control District (HCFCD) has scheduled a community meeting to reveal the results of an engineering study of the Taylor Gully watershed and Woodridge Village, the aborted development that flooded Elm Grove and North Kingwood Forest twice in 2019. The virtual meeting will be on: Two Related Efforts Because Woodridge Village sits […]

The post Taylor Gully-Woodridge Village Meeting Scheduled for Dec. 14 appeared first on Reduce Flooding.

Read More
News

Woodridge Village Excavation, Taylor Gully Updates

Harris County Flood Control District (HCFCD) says that, as of 10/31/22, Sprint Sand and Clay has hauled off 66,094 cubic yards of dirt from Woodridge Village. That means, despite the slowing real estate market, that the company has exceeded its Excavation and Removal contract minimum within nine months of the first year. Objective of Excavation […]

The post Woodridge Village Excavation, Taylor Gully Updates appeared first on Reduce Flooding.

Read More
News

New Woodridge Village Detention Basin About 12% Excavated, Engineering Study Almost Done

A new Woodridge Village Stormwater Detention Basin that could almost double detention capacity on the site continues to move forward slowly as housing starts slow. The trend at Woodridge seems consistent with other excavation and removal (E&R) contracts countywide. Meanwhile, the first draft of a preliminary engineering study for the Woodridge site and Taylor Gully […]

The post New Woodridge Village Detention Basin About 12% Excavated, Engineering Study Almost Done appeared first on Reduce Flooding.

Read More
News

Mitigation Update: 3rd Anniversary of First Elm Grove Flood

Back in 2019, portions of Elm Grove and North Kingwood Forest Villages flooded twice. The first time occurred on May 7th. According to Harris County Flood Control District’s (HCFCD) report on the storm, “A 30-min rate of 2.9 inches was recorded at US 59 and the West Fork of the San Jacinto River and a […]

The post Mitigation Update: 3rd Anniversary of First Elm Grove Flood appeared first on Reduce Flooding.

Read More
News

Sinkholes Often Sign of Damaged Storm Drains

Most of us have seen sinkholes. And most of us have probably given little thought to what causes them. Retired engineer Chris Bloch, a local flood fighter, found a 13-foot deep sinkhole near Taylor Gulley earlier this year that had become overgrown with vegetation. He immediately suspected a damaged storm drain nearby. Other things can […]

The post Sinkholes Often Sign of Damaged Storm Drains appeared first on Reduce Flooding.

Read More
News

Kingwood Diversion Ditch and Taylor Gully Preliminary Engineering Projects Begin

On June 29, 2021, Harris County Commissioners approved two contracts for preliminary engineering on the Kingwood Diversion Ditch and Taylor Gully Projects. This week, I’ve been getting reports of boots on the ground. So I grabbed my camera and went looking for activity this morning. I found a soil survey truck at Kingwood Drive next […]

The post Kingwood Diversion Ditch and Taylor Gully Preliminary Engineering Projects Begin appeared first on Reduce Flooding.

Read More