Rocky Woods

News

Reduce Flooding: Mobilization Begins for Next Phase of Ben’s Branch Restoration

Last week, Harris County Flood Control District (HCFCD) began mobilizing for the restoration of the Ben’s Branch drainage ditch between Kingwood Drive and Rocky Woods. The work will involve removing accumulated sediment that has diminished the conveyance capacity of the ditch. Engineers measure conveyance in terms of “level of service.” A 100-year level of service […]

The post Mobilization Begins for Next Phase of Ben’s Branch Restoration appeared first on Reduce Flooding.

Read More
News

Reduce Flooding: HCFCD Will Begin More Work on Ben’s Branch Starting January 19

Harris County Flood Control District (HCFCD) will begin repairing the next section of Ben’s Branch on January 19. The repairs will take place in the channel between Kingwood Drive and the natural portion of Ben’s Branch at the end of Rocky Woods Drive. Project Purpose Jose Predraza of Stuart Consulting is coordinating the project. He […]

The post HCFCD Will Begin More Work on Ben’s Branch Starting January 19 appeared first on Reduce Flooding.

Read More