Kingwood Drive

News

Next Challenge For City: Ditch Clean Out in Right of Way Under Kingwood Drive West of High School

About a half block west of Kingwood High School, G-103-36-03, a small drainage ditch without a name, cuts under Kingwood Drive. More than a hundred homes near this ditch flooded during Harvey. Before Imelda, Harris County Flood Control District did an emergency “de-snag” on the ditch. That means they cleaned out fallen trees that were […]

The post Next Challenge For City: Ditch Clean Out in Right of Way Under Kingwood Drive West of High School appeared first on Reduce Flooding.

Read More
News

CoH Excavating Silt from Diversion Ditch at Kingwood Drive

After finishing excavating silt from under the Kingwood Drive Bridge over Ben’s Branch, City crews are now doing the same under the bridge over the Diversion Ditch near the fire station on Kingwood Drive. Bridges are often chokepoints during floods because of their supports that reduce and sometimes slow the flow of water and contribute […]

The post CoH Excavating Silt from Diversion Ditch at Kingwood Drive appeared first on Reduce Flooding.

Read More
News

City Starting to Excavate Bottlenecks Under Kingwood Drive

For more than a year, HCFCD has excavated Ben’s Branch in four different phases. However, significant sediment remained under the Kingwood Drive Bridge. That’s property owned and maintained by the City of Houston. And now they are excavating that to eliminate a bottleneck. Such bottlenecks can back water up, damaging homes and businesses. According to […]

The post City Starting to Excavate Bottlenecks Under Kingwood Drive appeared first on Reduce Flooding.

Read More
News

Mobilization Begins for Next Phase of Ben’s Branch Restoration

Last week, Harris County Flood Control District (HCFCD) began mobilizing for the restoration of the Ben’s Branch drainage ditch between Kingwood Drive and Rocky Woods. The work will involve removing accumulated sediment that has diminished the conveyance capacity of the ditch. Engineers measure conveyance in terms of “level of service.” A 100-year level of service […]

The post Mobilization Begins for Next Phase of Ben’s Branch Restoration appeared first on Reduce Flooding.

Read More