Reduce Flooding: Kingwood Diversion Ditch Preliminary Engineering Review Released
2/8/2025 ā Harris County Flood Control District (HCFCD) has finally released the full text of the Kingwood Diversion Ditch Preliminary Engineering Review and its supporting files. The report, which was originally due in 300 days took more than 1400 days. When asked why it took so long, a HCFCD representative replied, āPersonnel turnover.ā The files [ā¦]
The post Kingwood Diversion Ditch Preliminary Engineering Review Released appeared first on Reduce Flooding.
Read More