Reduce Flooding: Woodridge Village Plans Still on Hold, But that Could Change Soon
Back in November 2023, Harris County Flood Control District (HCFCD) terminated its excavation and removal contract with Sprint Sand and Clay. The 2021 contract called for Sprint to remove up to 500,000 cubic yards of material from Woodridge Village. Had the full amount been excavated, it would have more than doubled the stormwater detention basin […]
The post Woodridge Village Plans Still on Hold, But that Could Change Soon appeared first on Reduce Flooding.
Read More