E&R - HoustonNewMedia.org https://houstonnewmedia.org/tag/er/ Building "Bridges" Across the Bayou City! Thu, 05 Jan 2023 17:53:52 +0000 en-US hourly 1 https://wordpress.org/?v=6.9 https://i0.wp.com/houstonnewmedia.org/wp-content/uploads/2022/11/cropped-cropped-Houston.png?fit=32%2C32&ssl=1 E&R - HoustonNewMedia.org https://houstonnewmedia.org/tag/er/ 32 32 103504436 Woodridge Village Excavation Rate Ticks Up https://houstonnewmedia.org/woodridge-village-excavation-rate-ticks-up/?utm_source=rss&utm_medium=rss&utm_campaign=woodridge-village-excavation-rate-ticks-up Thu, 05 Jan 2023 17:53:52 +0000 https://reduceflooding.com/?p=36996 The excavation rate of a sixth detention pond on Harris County Flood Control District’s (HCFCD) Woodridge Village property increased during the last month of 2022. That brought the total for the year to 73,745 cubic yards of soil removed under Sprint Sand and Gravel’s Excavation and Removal (E&R) Contract. The reported total at the end […]

The post Woodridge Village Excavation Rate Ticks Up appeared first on Reduce Flooding.

The post Woodridge Village Excavation Rate Ticks Up first appeared on HoustonNewMedia.org.

The post Woodridge Village Excavation Rate Ticks Up appeared first on HoustonNewMedia.org.

]]>
512495
Woodridge Village Excavation, Taylor Gully Updates https://houstonnewmedia.org/woodridge-village-excavation-taylor-gully-updates/?utm_source=rss&utm_medium=rss&utm_campaign=woodridge-village-excavation-taylor-gully-updates Tue, 01 Nov 2022 18:00:17 +0000 https://reduceflooding.com/?p=36134 Harris County Flood Control District (HCFCD) says that, as of 10/31/22, Sprint Sand and Clay has hauled off 66,094 cubic yards of dirt from Woodridge Village. That means, despite the slowing real estate market, that the company has exceeded its Excavation and Removal contract minimum within nine months of the first year. Objective of Excavation […]

The post Woodridge Village Excavation, Taylor Gully Updates appeared first on Reduce Flooding.

The post Woodridge Village Excavation, Taylor Gully Updates first appeared on HoustonNewMedia.org.

The post Woodridge Village Excavation, Taylor Gully Updates appeared first on HoustonNewMedia.org.

]]>
459293
New Woodridge Village Detention Basin About 12% Excavated, Engineering Study Almost Done https://houstonnewmedia.org/new-woodridge-village-detention-basin-about-12-excavated-engineering-study-almost-done/?utm_source=rss&utm_medium=rss&utm_campaign=new-woodridge-village-detention-basin-about-12-excavated-engineering-study-almost-done Fri, 30 Sep 2022 23:09:32 +0000 https://reduceflooding.com/?p=35526 A new Woodridge Village Stormwater Detention Basin that could almost double detention capacity on the site continues to move forward slowly as housing starts slow. The trend at Woodridge seems consistent with other excavation and removal (E&R) contracts countywide. Meanwhile, the first draft of a preliminary engineering study for the Woodridge site and Taylor Gully […]

The post New Woodridge Village Detention Basin About 12% Excavated, Engineering Study Almost Done appeared first on Reduce Flooding.

The post New Woodridge Village Detention Basin About 12% Excavated, Engineering Study Almost Done first appeared on HoustonNewMedia.org.

The post New Woodridge Village Detention Basin About 12% Excavated, Engineering Study Almost Done appeared first on HoustonNewMedia.org.

]]>
438435